Port Facilities

Incoming supplies such as equipment, reagents, and fuel will be barged to the port and then transported by truck and ferry to the mine site, with outgoing ore concentrate delivered via the same route and infrastructure.

 


Summary Information

Shore-based facilities will receive and store containers and fuel
Mineral concentrate will be loaded onto a lightering vessel
Approximately 5-6 trips over 3-4 days to load the bulk carrier
Up to 27 bulk carriers for concentrate transport per year
Equipment and supplies delivered by barge
Up to 33 marine barge loads annually